Opening day at Chirk

The track at Chirk is currently muddy at the top and is passable by a 4×4 (please take care).The tree with the root ball in the fast water the head of the Portmanteau has disappeared. However we do seem to have acquired a pontoon at the tail of the Sun Pool. This has been tied (via rope) to the bank.